GS-10 HausProjekt

Ground floor: Café, performances, meeting space, Vokü
1 OG: Cooperative day-care
2 OG: Communal living space, offices
3 OG: guest rooms, mystic portal to Switzerland
attic: gym, wood-working, metal-working, storage




News
19.04.2010 Haushalten has threatened to torpedo the Rockzipfel grant due to slow progress in finding other users for the building. (English at bottom)
15.04.2010 The plumber confirms that water service is available on the ground floor.
13.04.2010 Rockzipfel begins renovations.
09.04.2010 The Rockzipfel grant is approved.
16.03.2010 Water service is available on the 1.OG. The 1OG circuit breaker box has power. The electrician has been instructed to install electric heating in the 1OG stairwell WC. The electrician confirms that the wiring in the Eckladen is ready to use.
18.01.2010 The other owner of the adjoining property agrees to rent to us. Don't let the city collect your bio waste. We'll bury it in the garden as soon as the ground thaws.
13.01.2010 The Grundbuchamt had officially admitted that the GS-10 has fallen into foreign hands.
04.12.2009 The KWL (Leipzig waterworks) has sent a letter promising to connect the water within the next six weeks, or later if the weather is unfavorable.
30.11.2009 Haushalten confirms that the electricity has been connected. No water yet.
15.11.2009 Smoking policy sign
12.11.2009 An owner of the adjoining property has made contact! He agrees to our putting a garden there, and has also offered the possibility of selling it to us. More details as they come.

The city will connect electricity on the 26th of November. The GS-10 will therefore be usable by the first of December.
10.11.2009 The plumbers begin work. They expect to be finished at the end of November.
RSS feed for this site


links


exposés from summer 2009

exposé PDF DE

exposé PDF EN